{R}R Dev Notes


Found total of 1 articles.

The Forward Deployed Engineer, Chapter 9: The Outer Loop — Scaling Field Intelligence

Chapter 9 of The Forward Deployed Engineer blog series. The outer loop begins the moment a deployment goes into production. A teaser on gravel roads and paved superhighways, the productization decision, the platform commit, measuring leverage, and the two-team handshake.
2026-06-04